Testing

When larger equipment complexes are delivered it is necessary to test the individual parts of I&C equipment, their matching, to test functionality of logical units, to test together with technology and the subsequent commissioning with a training of operation staff.

Our staff, with many-year experience in industrial and power sectors, perform as needed:

  • FAT testing  (Factory Acceptance Test)
  • SAT testing (Site Acceptance Test)
  • Functional testing of equipment
  • Commissioning tests proving fulfilment of design parameters
  • Elaboration of project documentation (modification for needs of testing)
  • Processing of databases in the required format (for needs of testing)
  • Preparation of test programs, process procedures of testing (for individual types of testing)
  • Training of operation staff