Testing
When larger equipment complexes are delivered it is necessary to test the individual parts of I&C equipment, their matching, to test functionality of logical units, to test together with technology and the subsequent commissioning with a training of operation staff.
Our staff, with many-year experience in industrial and power sectors, perform as needed:
- FAT testing (Factory Acceptance Test)
- SAT testing (Site Acceptance Test)
- Functional testing of equipment
- Commissioning tests proving fulfilment of design parameters
- Elaboration of project documentation (modification for needs of testing)
- Processing of databases in the required format (for needs of testing)
- Preparation of test programs, process procedures of testing (for individual types of testing)
- Training of operation staff